Projects Frequently Asked Questions

A. Meralco application c/o Homeowner
B. Water application c/o Homeowner
C. Installation of meterbase c/o HMI/PPI

A. Installation fee is intact with MOve-in fees
B. Homeowner should apply individually and may be applied before move-in
C. Sub-meter are not allowed in energized phases/areas
D. Temporary electric meter are placed in areas that are not energized

A. Installation of permanent water supply is shouldered by the Homeowner
B. Payment of temporary water supply is intact with move-in fees
C. HMI/PPI has an accredited water service provider
D. Water tank available in case of water interruption

A. Changing the structural design of the house is not allowed
B. Vertical/Horizontal expansions should be approved under local/municipal ordinances

A. Construction of fence should not be over (5 feet)

A. Major Construction (Extension and Renovation) Php16,000.00
i. Major Construction Bond Fee: P15,000.00 – refundable
ii. Processing & Inspection Fee: P1,000.00 non-refundable
B. Minor Construction (ceiling,partition,tiles,canopy,grilles,fence) Php11,000.00
i. Major Construction Bond Fee: P10,000.00 – refundable
ii. Processing & Inspection Fee: P1,000.00 – non-refundable

A. Sidewalks are owned by the developer